-
ST. JOSEPH HOSPITAL EXPANSION PROJECT
Location: Tampa, FL Owner: BayCare GC: Robins & Morton Project Revenue: $510,000.00 Project Start and End Date: 2018 – 2019 Griffin designed and installed a dewatering system to dewater the excavation to 26 ft. below grade during construction of the expansion. THE CHALLENGE An engineered dewatering solution was required to lower groundwater below the…