  • LINVILLE DAM ESSI PROJECT

    Project Location: Morganton, NC Owner: Duke Energy GC: Phillips & Jordan Engineer: HDR Engineering, Inc. of the Carolinas Project Revenue: $973,000.00 Project Start and End Date: 2013-2014 THE CHALLENGE Excavation for the rehabilitation of the downstream side of the dam with the deepest subgrade 138 ft. below the normal pool of the lake. THE SOLUTION…