  • Gibson Generating Station Settling Pond

    Project Name: Gibson Generating Station Settling Pond Location: Owensville, Indiana Engineer: Burns & McDonnell Project Revenue: $7,717,023.00 The Challenge: Dewatering was necessary as the pond was built below the groundwater level and all CCR material had to be completely removed for clean closure of the pond. At times, the water table was higher than the…

  • Eppley Airfield Flood Protection Infrastructure

    Project Location: Omaha, Nebraska Owner: Omaha Airport Authority GC: Kiewit Engineer:  URS Corp & HDR Project Revenue:  $2.5 M Project Start and End Date: June 2011 – September 2011 THE CHALLENGE During the heavy rains in the Summer of 2011, the Eppley Airfield was nearly inoperable due to the Missouri River’s rising water levels. The…