  • Groundwater Management for Pearl Place Google Office Construction

    Project Location: Boulder, Colorado Owner:  Google GC: Saunders Construction Project Revenue: 1.3 Million Project Start and End Date: 12/7/2015 to 6/1/2017 Summary: Griffin provides dewatering and water treatment solution during construction of the Pearl Place Google Office Campus, requiring water drawdown to 30 feet (ft.). The Challenge The pearl place site was 380 ft. x…

  • Elmhurst Dam

    Project Name: Elmhurst Dam Rehabilitation Project Project Location: Roaring Brook Township, Pennsylvania Owner: Pennsylvania American Water Co. GC: Charles J. Merlo Project Revenue: $1,400,000.00 Project Start and End Date: 2014- 2017 Summary: The 117-year old Elmhurst Dam, is a 64-foot (ft.) high, 380 ft. long composite earth-fill embankment that provides drinking water and flood protection…

  • Addicks and Barker Dam Rehabilitation

    PROJECT NAME: Addicks and Barker Dam Rehabilitation PROJECT LOCATION: Houston, Texas OWNER: United States Army Corps of Engineers GC: Granite Construction ENGINEER: United States Army Corps of Engineers PROJECT REVENUE: $500,000.00 PROJECT TIME PERIOD: May 2017- Present Summary:  The Addicks and Barker Dams are part of the intricate flood control system near downtown Houston, TX.…