Day: November 14, 2018

  • Treatment of Heavy Metals in Groundwater at a Historic Site

    Project Location: Washington, DC Summary: Griffin must treat dewatering effluent to meet DOEE standards, at Historical Landmark Site. The Challenge: The design and construction of a utility plant was undertaken as part of a larger redevelopment of the historic 300-acre site in Washington D.C. where sixty-two (62) of the seventy (70) previously existing buildings are identified…