Dewatering System Design

Permanent and Temporary Dewatering System Design

When groundwater is encountered during construction, temporary dewatering must be addressed to facilitate construction of the building. Throughout the life of the building, groundwater must be controlled using a permanent dewatering systems. Griffin can design the most appropriate system for your projects using Analytical or Numerical methods.

Dewatering well design
Plan of Dewatering well design for a pond excavation, using MODFLOW. Case study in Johnston, Iowa.
© 2017 Griffin Dewatering Corporation. All Rights Reserved.